Calculator

New-Build Budget Estimator

Estimate the all-in cost of a new home: construction, lot, site work and contingency.

Example tool, not an offer

New-build budget estimator

Enter your own numbers. Nothing is filled in for you.

Estimated totalEnter your numbers
Construction$0
Lot + site work$0
Contingency$0
All-in cost per sq ft$0

Estimates for illustration only. Actual costs and income vary. Not an offer of credit or a loan quote.

How it works

Construction cost is your square footage times your estimated cost per square foot. Lot and site work are added separately so they stay visible. Contingency is a percentage of the subtotal. The all-in cost per square foot divides the total by your square footage.

Where to get the inputs

  • Cost per square foot: from builder estimates for your plan, not a regional average. We do not supply a default.
  • Lot cost: purchase price plus closing costs.
  • Site work: clearing, grading, driveway, septic or sewer, well or water, power. On raw land in Gaston County this can be large.
  • Contingency: more early in planning, less once bids are fixed.

What it leaves out

Soft costs you pay directly (plans, permits, fees, insurance), carrying costs and move-in costs. Add them to site work or read how to build a real new-home budget.

Calculations run in your browser; nothing is stored or sent. Estimates for illustration only.

FAQ

Questions about this calculator

How to use it and what it does not do.

Still have a question?

Send a short note about your project and we will reply.

Contact usAll FAQs
Why doesn't the calculator suggest a cost per square foot?

Because any default would be wrong for most projects. Enter the figure from written builder bids for your plan; if you do not have bids yet, run a range of values to see how sensitive the total is.

What goes in the site work field?

Clearing, grading, driveway, septic or sewer connection, well or water tap, power service and erosion control, plus soft costs you pay directly if you want them in the total.

How much contingency should I enter?

More while plans and bids are uncertain, less once scope and bids are fixed. Base it on your project's real unknowns.

Does the estimate include land?

Yes, if you enter the lot cost. Keeping land and site work as separate lines shows how much of the total sits outside the construction contract.

Is this a quote from Cresari?

No. It is an illustration based only on your inputs. Cresari does not build homes or quote construction prices.

Want us to check the numbers with you?

We can review a budget, bid set or rental model.