Areas we serve

Building and property consulting in Charlotte, NC

In Charlotte, land is expensive, rules changed with the 2023 Unified Development Ordinance, and infill projects live or die on the details. We help owners, small builders and investors plan with clear numbers.

Book a consultationLocal offices

Map of Gaston and Mecklenburg counties showing CharlotteGASTONMECKLENBURGGastoniaBelmontMount HollyCharlotte

Overview

Building and owning property in Charlotte

Charlotte had 874,579 residents in the 2020 Census (QuickFacts), and Mecklenburg County issued 7,496 building permits in 2025 (QuickFacts). Census figures for 2020 to 2024 put Mecklenburg's median owner-occupied home value at $406,800 and median gross rent at $1,627.

Charlotte's Unified Development Ordinance took effect June 1, 2023, consolidating zoning, subdivision, stormwater, tree and other rules into one document. Building permits for one- and two-family homes and townhomes are issued by Mecklenburg County Code Enforcement, and parcel and floodplain data are available through Polaris.

In depth

The 2040 Plan and the UDO

Charlotte's land use rules changed in two steps. City Council adopted the Charlotte Future 2040 Comprehensive Plan on June 21, 2021, which sorts land into Place Types. The Unified Development Ordinance, effective June 1, 2023, translates those Place Types into zoning districts and consolidates zoning, subdivision, stormwater, tree and other rules in one document.

For small owners and builders, the biggest change is what can go on a residential lot: duplexes and triplexes are allowed in many single-family neighborhoods not restricted by private covenants, and accessory dwelling units are allowed under the city's ADU rules. Private deed restrictions and HOA covenants can still prohibit what zoning allows, so read them first.

Permits: city zoning, county building

Charlotte reviews zoning; Mecklenburg County Code Enforcement issues building permits and performs inspections for one- and two-family homes and townhomes. Most new construction and additions require residential plan review, so permit time belongs in your schedule and in your carrying-cost budget.

Water, sewer and septic in Mecklenburg

Charlotte Water serves most of the city. Smaller residential connections are routine, but larger services (generally water services of 1.5 inches or larger, or equivalent sewer flow) go through Charlotte Water's Capacity Assurance Program, which must be approved before final connections. Charlotte Water says typical reviews take 20 business days and a full approval reserves capacity for two years. If you are planning small multifamily infill, submit a preliminary review early.

Some edge parcels still rely on septic and wells, which Mecklenburg County Groundwater and Wastewater Services permits. The county's basic steps for a new septic system start with an application and a soil and site evaluation; do not clear or grade the site before that evaluation.

Floodplains: FEMA and community maps

In 2000, Charlotte-Mecklenburg became the first community in the nation to show both current FEMA floodplains and future "Community Floodplains" on its official maps, based on expected upstream development (City of Charlotte). Development restrictions apply to both. The city reports more than 20,000 parcels and 2,900 buildings in regulated floodplains, and an elevation certificate is required before a certificate of occupancy is issued for a building in one. Floodplains along the Catawba River, Mountain Island Lake and Lake Wylie are being remapped, so check current and proposed maps for any lot near the water.

Charlotte or across the river?

Many of our clients compare a Charlotte infill lot with land in Gaston County. On Census figures for 2020 to 2024, Charlotte's median owner-occupied home value is $385,700 and median gross rent $1,612, against $266,000 and $1,153 for Gaston County. Charlotte also has more permitting volume (Mecklenburg issued 7,496 building permits in 2025) and stricter rules on trees, stormwater and floodplains. We run both options on the same terms so the comparison is fair.

Permit path, step by step

  1. Look up the parcel in Polaris: zoning district, floodplain and any overlays.
  2. Read deed restrictions and HOA covenants.
  3. Confirm Charlotte Water service, and capacity assurance if the project needs a larger service.
  4. Get city zoning review and plan review.
  5. Get the building permit from Mecklenburg County Code Enforcement.

A typical sequence for a new home or addition. Your project may need more approvals; confirm with each office.

Sources

  1. U.S. Census Bureau QuickFacts, Charlotte city
  2. U.S. Census Bureau QuickFacts, Mecklenburg County
  3. Charlotte Future 2040 Comprehensive Plan
  4. Charlotte UDO
  5. City of Charlotte ADU rules
  6. Mecklenburg County Code Enforcement
  7. Charlotte Water Capacity Assurance Program
  8. Mecklenburg County: basic steps for a new septic system
  9. City of Charlotte: flooding and maps

Public sources retrieved November 2026.

What comes up here

Issues we look at in Charlotte

01

Infill under the UDO

The UDO changed what can be built on many residential lots, including duplexes and triplexes in many single-family neighborhoods not bound by covenants or HOAs (WSOC-TV). Confirm the rules for your lot with the city.

02

Land is the big number

With higher land values, a small overrun in site work or soft costs has a big effect on whether the project works. Budget them line by line.

03

Plan review and permits

Most residential new construction and additions require plan review. Build permit time into the schedule and the carrying-cost budget.

04

Charlotte or Gaston?

Many clients compare a Charlotte infill lot with land across the river. We run both on the same terms.

FAQ

Questions about Charlotte, NC

Straight answers about building, land and property in Charlotte.

Still have a question?

Send a short note about your project and we will reply.

Contact usAll FAQs
When did Charlotte's UDO take effect?

June 1, 2023. It replaced the old zoning and subdivision ordinances with one Unified Development Ordinance that implements the Charlotte Future 2040 Comprehensive Plan. Charlotte UDO.

Can I build a duplex or triplex on a single-family lot in Charlotte?

In many neighborhoods, yes: the UDO allows duplexes and triplexes in many residential districts that were previously single-family only. Private covenants and HOA rules can still prohibit them, and each lot must meet the district's dimensional rules.

Who issues building permits in Charlotte?

Mecklenburg County Code Enforcement issues building permits and performs inspections, after City of Charlotte zoning review. Mecklenburg County.

How big can an ADU be in Charlotte?

Under UDO Section 15.6.F, a detached ADU is limited to 600 heated square feet or 70 percent of the main home's total floor area, whichever is greater, and never more than 1,000 heated square feet. See our ADU guide.

Is my Charlotte lot in a floodplain if FEMA says no?

Possibly. Charlotte-Mecklenburg also maps a Community Floodplain based on future upstream development, and floodplain development restrictions apply to both maps. City of Charlotte.

Do I need capacity approval from Charlotte Water?

For larger services, generally water services of 1.5 inches or larger or the equivalent sewer flow, yes: Charlotte Water's Capacity Assurance Program must approve the project before final connections. Charlotte Water.

What is the median home value in Charlotte?

The Census Bureau's 2020 to 2024 estimate is $385,700 for owner-occupied homes in the city, with median gross rent of $1,612.

Planning a project in Charlotte?

Send us the address or parcel ID and a few lines about your plans.