In depth
The 2024 Land Development Code
Cramerton adopted a new Land Development Code effective May 7, 2024, amended through September 16, 2025. It applies inside town limits and in the town's ETJ, and the official zoning map is the final word on a parcel's district; you can search it on the town's interactive zoning map.
The code is strict about sequence. No structure may be built, moved or enlarged, and no clearing, grubbing or filling for a building may start, until the town issues a development approval. Per the town's zoning permit page, an approved zoning permit is required before you apply to Gaston County for a building permit. The county then does all building code review and inspections in Cramerton, and Gaston County Natural Resources reviews erosion control and Phase II stormwater plans.
Plans that signal what comes next
The town's planning documents include a 2022 Land Use Plan (adopted June 2, 2022) with a Future Land Use Map, small area plans for Wilkinson South and Market Street, a Downtown Vision 2040, and a Build a Better Boulevard plan, plus greenway, bicycle and pedestrian master plans. If you are buying land near Wilkinson Boulevard or downtown, read the matching small area plan: it tells you what the town hopes to see and how a rezoning request is likely to be received.
Water, sewer and the Eagle Road plant
Cramerton and Gastonia merged their water and wastewater systems into Two Rivers Utilities, the first regional utility of its kind in the county (Town of Cramerton). TRU's Eagle Road wastewater plant, permitted for 4 million gallons per day, is in Cramerton and serves the town and portions of Belmont and Lowell (TRU report). For a new connection or a lot split, ask TRU for written availability and fees early.
Floodplain and the South Fork
Cramerton maintains its own Flood Hazard Ordinance and a Flood Development Permit application. Riverfront and creekside lots should be checked on NC FRIS before you make an offer, and any renovation of a home in the floodplain should be tested against the 50 percent substantial improvement rule, which can require the whole building to meet current flood standards.
Permit path, step by step
- Find the zoning district on the Cramerton interactive zoning map.
- Check flood status and whether a Flood Development Permit is needed.
- Confirm water and sewer with Two Rivers Utilities.
- Submit the Cramerton zoning permit package to planning staff.
- Apply to Gaston County for the building permit.
A typical sequence for a new home or addition. Your project may need more approvals; confirm with each office.
Sources
- U.S. Census Bureau QuickFacts, Cramerton town
- Town of Cramerton zoning permits
- Town of Cramerton documents and plans
- Cramerton interactive zoning map
- Town of Cramerton water and sewer
- Town of Cramerton history
- Two Rivers Utilities 2023 to 2024 Wastewater Performance Report
- Gaston County Building Inspections
Public sources retrieved November 2026.