In depth
Permits in Dallas
The Dallas zoning ordinance requires a town permit for new construction, additions and remodels, accessory structures and fences, demolition, signs and some home occupations. Before applying, confirm the parcel is inside the Town of Dallas zoning jurisdiction and get the parcel number from Gaston County GIS. Building permits and inspections come from Gaston County.
The town also publishes an interactive development map showing residential and commercial projects and where each sits in review, plus a 2030 Comprehensive Land Use Plan and a Town Center Plan on its planning page. Rezoning, variance, special use and preliminary site plan applications go to the planning department.
Minor and major subdivisions
Dallas treats every division of land into two or more lots for sale or building as a subdivision that needs a subdivision permit and plat approval. Per the town's planning page, a minor subdivision has no new roads, covers ten acres or less, results in ten or fewer lots, and needs no extension of public water, sewer or electric lines. Anything beyond that is a major subdivision. State law exempts some divisions entirely, such as parcels over 10 acres with no new street (G.S. 160D-802), so check both.
Water and sewer extension rules
Section 152.075 of the Dallas subdivision code is unusually specific. Inside town limits, each new lot must be served by an extension of the town's water and sewer at the subdivider's expense. Outside town limits, the extension is required when any part of the tract lies within these distances of an existing public line, unless the Board of Aldermen waives it:
| Dwelling units proposed | Distance to existing line |
|---|---|
| 0 to 10 | 200 feet |
| 11 to 20 | 300 feet |
| 21 to 50 | 600 feet |
| 51 to 100 | 1,000 feet |
| 101 or more | 1,500 feet |
Where sewer is not feasible, septic systems may be allowed, but plats must state that the town does not guarantee any lot's suitability for septic. A single well needs county health approval, and private community water systems with 2 to 14 connections are not allowed. For a landowner, these rules can decide whether a small split is cheap or very expensive.
Electric service is local too
Because the town is the electric provider for its service area, new service, line extensions and underground requirements for subdivisions run through the town rather than a large investor-owned utility. Ask the town about electric availability and any extension cost at the same time you ask about water and sewer. Two Rivers Utilities' Long Creek plant also serves portions of Dallas (TRU report).
Permit path, step by step
- Confirm the parcel is in Dallas zoning jurisdiction (county GIS).
- Classify any land division as exempt, minor or major.
- Ask the town about water, sewer and electric availability and extension rules.
- Get the Dallas zoning permit (and subdivision permit if splitting).
- Apply to Gaston County for the building permit.
A typical sequence for a new home or addition. Your project may need more approvals; confirm with each office.
Sources
- U.S. Census Bureau QuickFacts, Dallas town
- Town of Dallas permits
- Town of Dallas Planning and Zoning
- Town of Dallas services
- Dallas Code 152.075 Water and Sewer Systems
- NC DNCR historical marker: Dallas
- Two Rivers Utilities 2023 to 2024 Wastewater Performance Report
- G.S. 160D-802
- Gaston County Building Inspections
Public sources retrieved November 2026.