Calculator
Build vs. Buy Comparison
Compare the all-in cost of building with buying a comparable home, including holding costs while you build.
How it works
Build cost = land + soft costs and site work + construction, plus contingency on construction, plus months of extra wait x your monthly holding cost (for example rent, taxes and insurance). Buy cost = resale price + near-term repairs and updates. The difference shows which path costs more on these inputs.
Make it a fair comparison
- Compare homes of similar size, bedrooms, location and condition.
- Include repairs an older home will need soon.
- Holding cost is what you pay while waiting, such as rent, taxes and insurance.
The calculator does not price the non-financial factors: fit, risk and stress. Read Building vs. Buying for the full framework.
Calculations run in your browser; nothing is stored or sent. Estimates for illustration only.
FAQ
Questions about this calculator
How to use it and what it does not do.
What is the holding cost input?
What you pay each month while waiting for the new home, such as rent, taxes and insurance, multiplied by the extra months building takes.
What does the comparison leave out?
Non-financial factors like fit, risk and stress, as well as differences in long-term maintenance and resale. Use the result as one input.
Should I include repairs on the home I would buy?
Yes. Near-term repairs and updates belong in the buy side so you compare move-in-ready to move-in-ready.
How many extra months should I enter for building?
Use your builder's schedule plus design, permitting and approvals. As a reference, Census data show contractor-built homes on owners' land averaged 9.0 months of construction in the South in 2025.
Is the result a recommendation?
No. It shows which option costs more on the numbers you entered. The decision is yours.
More tools
Other calculators
New-Build Budget Estimator
Add up construction, lot, site work and contingency, and see your all-in cost per square foot.
Rental Income and Cap Rate
Net operating income, cap rate and break-even occupancy for a rental, from your own inputs.
Construction Draw Schedule
Map a contract amount to milestones and see retainage held and cumulative payments.
Want us to check the numbers with you?
We can review a budget, bid set or rental model.